NYSDOT - New York State Department of Transportation
Design Phases V-VI for the construction of a ramp between Route 9A and Taconic State Parkway, Westchester County. Reevaluation of the Final Design Report/Final EIS; prepare plans, specifications and estimates (PS&E); survey and mapping services; traffic flow and safety conditions; analyze ramp junctions and prepare M&PT plans.
NYCDOT - New York City Department of Transportation
Total Design and Construction Support Services for reconstruction of five bridges in Manhattan and the Bronx including rigid-frame Pelham Parkway Bridge over Hutchinson River Parkway, East 188th Street Bridge over Metro-North, Riverside Drive Viaduct over West 158th Street, City Island Bridge over Eastchester Bay, and East 78th Street Pedestrian Bridge over FDR Drive. Work includes in-depth inspection and preparation of BRPR, seismic analysis, approach work, utilities, M&PT, and shop drawing review.
111 John Street, 3rd Floor,
New York, NY 10038
Phone: 212-349-2900 / Fax: 212-285-0205
Email: gandhi@gandhieng.com